US$ 19000.00
the German Army Ordnance Bureau decided in 1932 to develop six military half tracks
6mm (4mm scale) B9 to A5 Points
Working volage: 12-18 V DC or AC
but many still survive today
Detailed Printing and Livery Detail
4P-020-121 GWR Toplight Mainline City Lined Chocolate & Cream Composite 7903 Set 2 Stock-Alert-1 the German Army Ordnance BureauThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 19000.00
US$ 118500.00
US$ 15300.00
US$ 12900.00
US$ 24500.00
US$ 12500.00
US$ 24000.00
US$ 74000.00
US$ 18500.00
US$ 24000.00
US$ 3500.00
US$ 24000.00
US$ 14000.00
US$ 28000.00
US$ 8000.00
US$ 21500.00
US$ 17000.00
US$ 30000.00
US$ 83000.00
US$ 22500.00